翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Mohave Generating Station : ウィキペディア英語版
Mohave Power Station

Mohave Power Station (known also as Mohave Generating Station, or MOGS) was a coal-fired power plant located in Laughlin, Nevada. Southern California Edison is the majority owner of the plant and was its operator. The plant is currently shut down and in the process of being dismantled.
The plant was composed of two units capable of generating electrical each. Combustion Engineering supplied the boilers and GE supplied the turbines and generators. Bechtel performed engineering, procurement and construction.
The Mohave Generating Station was built on a site in the Sonora Desert adjacent to the Colorado River in Laughlin, Clark County. It had supercritical boilers and cross-compound steam turbines. The plant was owned by a utility consortium of operator Southern California Edison Co (56%), LADWP (10%), Nevada Power (14%), and Salt River Project (20%).
Mohave was the only power plant in the United States that used coal delivered by coal-slurry pipeline. The diameter Black Mesa Pipeline ran to the plant from the Peabody Energy Black Mesa Mine in Kayenta, AZ, and could deliver per hour. The land where the mine is located is owned by the Navajo and Hopi tribes. Four 8-million-gallon storage tanks each held the equivalent of of dry coal. The slurry transport water was recycled for cooling tower water makeup; this and all other waste water was reused, making Mohave a zero-discharge facility. A natural-gas line run to the facility from a gas main near Topock, Arizona supplied the required heat to start the plant, although the line was too small to run the plant exclusively on gas. The power was transmitted via two 500kV lines to substations in southern Nevada and southern California.
==Commissioning==
The plant's two identical units went into initial operation in 1971.